INTERIOR
NEW FRAMES
All the gray primed frames are new. |
 |
PINE
ON FORKLIFT
The yellow pine for the planking arrives. |
 |
SNOWY
PLANKING
It is a good thing TRUE LOVE is in a shed. |
 |
CUTTING
PLANKING
The crew starts to cut and scarf planking in preparation
for installation. |
 |
FIRST
NEW PLANK
Finally the first new plank goes on. |
 |
2
NEW PLANKS
Things take shape as more planks go on. |
 |
SHAPING
NEW PLANK
A new plank gets shaped in the shop. |
 |
NEW
STEM & 1ST PLANK FASTENED
The 1st plank fitted to the new stem. |
 |
RE-DRIFTING
STERN POST
New bronze rods are driven into the sternpost. |
 |
DECK
BEAM CAMBER
The first of the deck beams are cut. |
 |
NEW
BILGE STRINGER
Because of all the frame sisters over the years
the bilge stringer looked like swiss cheese and
gets renewed. |
 |
HOISTING
DECK BEAMS
A pre-fabricated section of the deck beams and mast
partners forward gets hoisted into place. |
 |
NEW
TRANSOM FRAMING
New transom framing, when we took off the old plywood
transom the whole framonf assembly fell to the floor
in a pile of rotten wood. |
 |
INTERIOR
The interior is looking better. |
 |
DECK
AFT
Everything gray is new, the old cockpit is still
in place. |
 |
DECK
FROM BOW
Looking aft from the bow at the end of March. |
 |