RESTORATION HOME

1st VISIT

SURVEY & AUCTION

DELIVERY

DECEMBER '02

JANUARY '03

FEBRUARY '03

MARCH '03

APRIL '03

MAY '03

JUNE '03

JULY '03

AUGUST '03

SEPTEMBER '03

OCTOBER '03

OCTOBER 2003 : (Click a picture to see larger version)

DECK DETAIL
Varnish gets built up and details taken care of.
STANCHION BASES
These stanchion bases add strength to the bulwarks. They are custom cast by Port Townsend Foundry to the angle of the bulwarks at each location.
STANCHIONS
The stanchions are installed.
COCKPIT
Progress in the cockpit.
GUILDING SCROLL FWD
Tim Conway of Conway Signs guilds the scroll he drew using only one plank left from the original scroll.
SCROLL FWD
The completed forward port scroll.
GUILDING SCROLL AFT
SCROLL AFT
EXHAUST SYSTEM
Soundown was used to build the exhaust system.
FUEL MANIFOLD
One of the Racor filters can be changed without shutting down the engine.
ENGINE BOX
The engine box begins to take shape.
ELECTRICAL PANEL
TRUE LOVE has never seen systems loke this before.
SALON LOOKING AFT
Progress below
SALON LOOKING FWD
AFT CABIN DOUBLE BUNK
PROPANE LOCKERS
US Coast Guard regulations require the propane lockers to be on deck, these boxes house a 10# horizontal tank each and make great seats.
LAUNCH 1
The travelift picks up the boat and heads for the final launch.
LAUNCH 2
LAUNCH 3
LAUNCH 4

 

© Harmony Cottage Yacht Corporation ALL RIGHTS RESERVED
Internet Management by Webnett